大甲溪發電廠青山分廠復建計畫第III-C標161kV交連PE電力電纜及附屬設備工程
Goaping ~Jiaxian line, Zhumen ~Jiaxian line 69
此工程區分六個區間於2014-2016年施作,為921大地震損壞復建工程,需配合蜿蜒的山壁及殘破的道路,器材運輸及施工難度高,合隆電工克服萬般險阻,如期如質完工,該工程獲得經濟部金質獎的殊榮及肯定。
This project was divided in 6 intervals and conducted in 2014 to 2016. As a restoration project of 921 earthquake, wind cliffs and dilapidated roads made the difficulty of equipment transference and engineering harder. Ho Lung conquered all challenges and completed the project with quality as scheduled. This project is also awarded with The National Golden Award by Ministry of Economic Affairs, R.O.C.